"Plataine’s solution will increase our competitiveness through tangible savings in raw material and improved throughput, and will thus help us manage rising production cost pressures."

Learn More:

Automate. Optimize.
Bridge the Gap between CAD and ERP

TPO FabricOptimizer is an end-to-end Total Production Optimization solution from the freezer to the autoclave and beyond.  TPO dynamically produces an optimized and automated holistic plan for the cutting of composite fabrics by bridging the gap between ERP/MRP, CAD and the shop floor. 
TPO helps manufacturers do more with less, enabling:

 

  • 5-15% Material Savings
  • Increased flexibility and JIT manufacturing 
  • Increased Quality 
  • Increased competitiveness in the Sales Bid (Tender) process